
Taghart Wind Farm
Preview
North Kildare Wind Farm Limited is applying for planning permission for a development consisting of 11 wind turbines and associated infrastructure. The proposed wind farm is located approximately 3.5km west of Carbury, and approximately 2.5km northwest of Timahoe, Co. Kildare.
Following consultations pursuant to Section 37B of the Planning & Development Act 2000 (as amended), An Bord Pleanála determined that the proposed development is Strategic Infrastructure Development within the meaning of Section 37A of the Act which necessitates a planning application being made directly to An Bord Pleanála.
It is a requirement of the Board that the applicant creates a specific website to include all of the application documentation.
P22-242-0100-0000 - Schedule of drawings.pdf
P22-242-0100-0001.pdf
P22-242-0100-0002.pdf
P22-242-0100-0003.pdf
P22-242-0100-0004.pdf
P22-242-0100-0005.pdf
P22-242-0100-0006.pdf
P22-242-0101-0001.pdf
P22-242-0101-0002.pdf
P22-242-0101-0003.pdf
P22-242-0101-0004.pdf
P22-242-0101-0005.pdf
P22-242-0101-0006.pdf
P22-242-0101-0007.pdf
P22-242-0101-0008.pdf
P22-242-0101-0009.pdf
P22-242-0101-0010.pdf
P22-242-0101-0011.pdf
P22-242-0101-0012.pdf
P22-242-0101-0013.pdf
P22-242-0101-0014.pdf
P22-242-0101-0015.pdf
P22-242-0101-0016.pdf
P22-242-0101-0017.pdf
P22-242-0101-0018.pdf
P22-242-0101-0019.pdf
P22-242-0101-0020.pdf
P22-242-0101-0021.pdf
P22-242-0101-0022.pdf
P22-242-0101-0023.pdf
P22-242-0101-0024.pdf
P22-242-0101-0025.pdf
P22-242-0101-0026.pdf
P22-242-0101-0027.pdf
P22-242-0101-0028.pdf
P22-242-0101-0029.pdf
P22-242-0101-0030.pdf
P22-242-0101-0031.pdf
P22-242-0101-0032.pdf
P22-242-0101-0033.pdf
P22-242-0101-0034.pdf
P22-242-0101-0035.pdf
P22-242-0101-0036.pdf
P22-242-0101-0037.pdf
P22-242-0101-0038.pdf
P22-242-0101-0039.pdf
P22-242-0101-0040.pdf
P22-242-0300-0001.pdf
P22-242-0300-0002.pdf
P22-242-0300-0003.pdf
P22-242-0300-0004.pdf
P22-242-0300-0005.pdf
P22-242-0300-0006.pdf
P22-242-0300-0007.pdf
P22-242-0300-0008.pdf
P22-242-0300-0009.pdf
P22-242-0300-0010.pdf
P22-242-0300-0011.pdf
P22-242-0300-0012.pdf
P22-242-0300-0013.pdf
P22-242-0300-0014.pdf
P22-242-0300-0015.pdf
P22-242-0300-0016.pdf
P22-242-0300-0017.pdf
P22-242-0300-0018.pdf
P22-242-0300-0019.pdf
P22-242-0300-0020.pdf
P22-242-0300-0021.pdf
P22-242-0300-0022.pdf
P22-242-0300-0023.pdf
P22-242-0300-0024.pdf
P22-242-0300-0025.pdf
P22-242-0300-0026.pdf
P22-242-0300-0027.pdf
P22-242-0300-0028.pdf
P22-242-0300-0029.pdf
P22-242-0300-0030.pdf
P22-242-0501-0001.pdf
P22-242-0501-0002.pdf
P22-242-0501-0003.pdf
P22-242-0501-0004.pdf
P22-242-0501-0005.pdf
P22-242-0501-0006.pdf
P22-242-0501-0007.pdf
Chapter 1 - Introduction.pdf
Chapter 2 - Need for the Development, Site Selection and Assessment of Alternatives Considered.pdf
Chapter 3 - Description of the Proposed Development(1.3).pdf
Chapter 4 - Policy.pdf
Chapter 5 - Scoping and Consultation.pdf
Chapter 6 - Air Quality and Climate.pdf
Chapter 7 - Noise and Vibration.pdf
Chapter 8.1 - Biodiversity.pdf
Chapter 8.2 - Ornithology.pdf
Chapter 9 - Land, Soils, Geology and Hydrogeology.pdf
Chapter 10 - Hydrology and Water Quality.pdf
Chapter 11 - Population, Human Health and Material Assets.pdf
Chapter 12 - Shadow Flicker.pdf
Chapter 13 - Traffic and Transportation.pdf
Chapter 14 - Cultural Heritage.pdf
Chapter 15 - Landscape and Visual.pdf
Chapter 16 - Telecoms and Aviation.pdf
Chapter 17 - Interactions of the Foregoing.pdf
Appendix_1_Introduction.pdf
Appendix_3_Description of the Proposed Development.pdf
Appendix_5_Scoping and Consultation.pdf
Appendix_6_Air and Climate.pdf
Appendix_7_Noise and Vibration.pdf
Appendix_8.1_Biodiversity.pdf
Appendix_8.2_Ornithology.pdf
Appendix_9_ Land Soils and Geology.pdf
Appendix_10_Hydrology and Water Quality.pdf
Appendix_12_Shadow Flicker.pdf
Appendix_13_Traffic and Transport.pdf
Appendix_14_Cultural Heritage_Appendix.pdf
Appendix_15_Landscape and Visual.pdf
Appendix_16_Telecoms and Aviation.pdf