Taghart Wind Farm
Knockanarragh Wind Farm SID Application
Knockanarragh Wind Farm Limited is applying for planning permission for a development consisting of up to 8 wind turbines and associated infrastructure. The proposed wind farm is located south of Clonmellon in Co. Westmeath.
Following consultations pursuant to Section 182E of the Planning & Development Act 2000 (as amended), An Bord Pleanála determined that the proposed development is Strategic Infrastructure Development within the meaning of Section 182A of the Act, which necessitates a planning application being made directly to An Bord Pleanála.
It is a requirement of the Board that the applicant creates a specific website to include all of the application documentation.
ABP-314271-22 Addendum 1 - Schedule of Planning Drawings.pdf
ABP-314271-22 Addendum 2 – Letters of Consent.pdf
ABP-314271-22 Addendum 3 - Pre – Planning and Public Consultation.pdf
ABP-314271-22 Addendum 4 - Record of Meeting Minutes.pdf
ABP-314271-22 Addendum 5 - Letters to Meath & Westmeath County Council.pdf
ABP-314271-22 Addendum 6 – Schedule of Prescribed bodies & Letters.pdf
ABP-314271-22 Addendum 7 - EIA Portal Confirmation.pdf
ABP-314271-22 Addendum 8 - EFT Payment Receipt.pdf
ABP-314271-22 Addendum 9 - Final SID notification.pdf
ABP-314271-22 Addendum 10 - Newspaper Notice.pdf
ABP-314271-22-MWP-Schedule of Planning Drawings.pdf
ABP-314271-22-MWP-001-P08.pdf
ABP-314271-22-MWP-002-P08.pdf
ABP-314271-22-MWP-003-P07.pdf
ABP-314271-22-MWP-004-P03.pdf
ABP-314271-22-MWP-005-P07.pdf
ABP-314271-22-MWP-006-P03.pdf
ABP-314271-22-MWP-007-P07.pdf
ABP-314271-22-MWP-008-P04.pdf
ABP-314271-22-MWP-009-P03.pdf
ABP-314271-22-MWP-010-P05.pdf
ABP-314271-22-MWP-011-P03.pdf
ABP-314271-22-MWP-012-P03.pdf
ABP-314271-22-MWP-013-P04.pdf
ABP-314271-22-MWP-014-P05.pdf
ABP-314271-22-MWP-015-P05.pdf
ABP-314271-22-MWP-016-P05.pdf
ABP-314271-22-MWP-017-P05.pdf
ABP-314271-22-MWP-018-P05.pdf
ABP-314271-22-MWP-019-P05.pdf
ABP-314271-22-MWP-020-P05.pdf
ABP-314271-22-MWP-021-P05.pdf
ABP-314271-22-MWP-022-P05.pdf
ABP-314271-22-MWP-023-P03.pdf
ABP-314271-22-MWP-024-P04.pdf
ABP-314271-22-MWP-025-P06.pdf
ABP-314271-22-MWP-026-P05.pdf
ABP-314271-22-MWP-027-P05.pdf
ABP-314271-22-MWP-028-P05.pdf
ABP-314271-22-MWP-029-P05.pdf
ABP-314271-22-MWP-030-P05.pdf
APB-314271-22-MWP-031-P05.pdf
APB-314271-22-MWP-032-P05.pdf
APB-314271-22-MWP-033-P05.pdf
APB-314271-22-MWP-034-P05.pdf
APB-314271-22-MWP-035-P06.pdf
APB-314271-22-MWP-036-P01.pdf
ABP-314271-22.SLR Schedule of Planning Drawings.pdf
ABP-314271-22.PL01.4.Overall Project Location Map and TD Route.pdf
ABP-314271-22.PL02.4.Overall Site Location Map and Site Notice Locations.pdf
ABP-314271-22.PL03-0.4.Existing Site Layout - Key Plan.pdf
ABP-314271-22.PL03-1.4.Existing Site Layout - Sheet 1 of 5.pdf
ABP-314271-22.PL03-2.4.Existing Site Layout - Sheet 2 of 5.pdf
ABP-314271-22.PL03-3.4.Existing Site Layout - Sheet 3 of 5.pdf
ABP-314271-22.PL03-4.4.Existing Site Layout - Sheet 4 of 5.pdf
ABP-314271-22.PL03-5.4.Existing Site Layout - Sheet 5 of 5.pdf
ABP-314271-22.PL04-0.4.Proposed Site Layout - Key Plan.pdf
ABP-314271-22.PL04-1.4.Proposed Site Layout - Sheet 1 of 5.pdf
ABP-314271-22.PL04-2.4.Proposed Site Layout - Sheet 2 of 5.pdf
ABP-314271-22.PL04-3.4.Proposed Site Layout - Sheet 3 of 5.pdf
ABP-314271-22.PL04-4.4.Proposed Site Layout - Sheet 4 of 5.pdf
ABP-314271-22.PL04-5.4.Proposed Site Layout - Sheet 5 of 5.pdf
ABP-314271-22.PL05-0.4.Proposed Turbine Layout Plan - Key Sheet.pdf
ABP-314271-22.PL05-1.4.Proposed Turbine Layout No.1.pdf
ABP-314271-22.PL05-2.4.Proposed Turbine Layout No.2.pdf
ABP-314271-22.PL05-3.4.Proposed Turbine Layout No.3.pdf
ABP-314271-22.PL05-4.4.Proposed Turbine Layout No.4.pdf
ABP-314271-22.PL05-5.4.Proposed Turbine Layout No.5.pdf
ABP-314271-22.PL05-6.4.Proposed Turbine Layout No.6.pdf
ABP-314271-22.PL05-7.4.Proposed Turbine Layout No.7.pdf
ABP-314271-22.PL05-8.4.Proposed Turbine Layout No.8.pdf
ABP-314271-22.PL06.4.Turbine Elevation.pdf
ABP-314271-22.PL07.4.Turbine Foundations & Crane Hardstanding Layout-A2L.pdf
ABP-314271-22.PL08-1.4.Permanent -Temporary Operation Compounds.pdf
ABP-314271-22.PL08-2.4.Permanent -Temporary Operation Compounds.pdf
ABP-314271-22.PL09.4.Gate & Fence.pdf
ABP-314271-22.PL10.4.Proposed Drainage Layout.pdf
ABP-314271-22.PL11.4.Typical Drainage Details - Schematic Plan.pdf
ABP-314271-22.PL12.4.Typical Drainage Details - Outfall Details.pdf
ABP-314271-22.PL13.4.Typical Drainage Details - Silt Fence Details.pdf
ABP-314271-22.PL14.4.Typical Drainage Details - Silt Trap Details.pdf
ABP-314271-22.PL15.4.Typical Drainage Details - Culvert Details.pdf
ABP-314271-22.PL16.4.Typical Drainage Details - Manhole Details.pdf
ABP-314271-22.PL17.4.Typical Cable Trench Details.pdf
ABP-314271-22.PL18.4.Typical_Joint_Bay_Details-A1L.pdf
ABP-314271-22.PL19.4.Cable Connection Location.pdf
ABP-314271-22.PL20.4.Cable Connection Location To Substation.pdf
ABP-314271-22.PL21-1.4.Borrow Pit 1.pdf
ABP-314271-22.PL21-2.4.Borrow Pit 2.pdf
ABP-314271-22.PL22.4.Site Access Locations - Key Plan.pdf
ABP-314271-22.PL23-1.4.Node 7 Access Layout N52.pdf
ABP-314271-22.PL23-2.4.Node 7 Swept Path Analysis.pdf
ABP-314271-22.PL24.4.Node 10 Swept Path Analysis.pdf
ABP-314271-22.PL25-1.4.Node 11 Access Layout.pdf
ABP-314271-22.PL25-2.4.Node 11 SPA L5542 South.pdf
ABP-314271-22.PL26.4.Node 12 Swept Path Analysis.pdf
ABP-314271-22.PL27-1.4.Node 13 Access Layout L5542 North.pdf
ABP-314271-22.PL27-2.4.Node 13 Swept Path Analysis.pdf
ABP-314271-22.PL28.4.Road Construction Details.pdf
ABP-314271-22.PL29.Substation Landscape Plan-MW.pdf
ABP-314271-22 Chapter 1 Introduction.pdf
ABP-314271-22 Chapter 2 Development Description.pdf
ABP-314271-22 Chapter 3 Alternatives.pdf
ABP-314271-22 Chapter 4 Population and Human Health.pdf
ABP-314271-22 Chapter 5 Biodiversity.pdf
ABP-314271-22 Chapter 6 Land Soils and Geology.pdf
ABP-314271-22 Chapter 7 Water.pdf
ABP-314271-22 Chapter 8 Air and Climate.pdf
ABP-314271-22 Chapter 9 Noise.pdf
ABP-314271-22 Chapter 10 Landscape and Visual.pdf
ABP-314271-22 Chapter 11 Shadow Flicker.pdf
ABP-314271-22 Chapter 12 Cultural Heritage.pdf
ABP-314271-22 Chapter 13 Material Assets.pdf
ABP-314271-22 Chapter 14 Traffic.pdf
ABP-314271-22 Chapter 15 MAND.pdf
ABP-314271-22 Chapter 16 Interactions .pdf
ABP-314271-22 Chapter 17 Mitigation .pdf
ABP-314271-22 Appendix 1-1 Dev Considered.pdf
ABP-314271-22 Appendix 1-2 Scoping Consultees.pdf
ABP-314271-22.Appendix 1-3 Scoping Report.pdf
ABP-314271-22.Appendix 1-4 Community Engagement.pdf
ABP-314271-22 Appendix 2-1 Candidate Turbine Specifications.pdf
ABP-314271-22 Appendix 2-2 CEMP.pdf
ABP-314271-22 Appendix 5.1 County Development Plans.pdf
ABP-314271-22 Appendix 5.2 Baseline Bird Reports.pdf
ABP-314271-22 Appendix 5.3 Baseline Bat Reports redacted.pdf
ABP-314271-22 Appendix 5.4 Aquatic Ecology Reports redacted.pdf
ABP-314271-22 Appendix 5.5 Terms for Impact Assessment.pdf
ABP-314271-22 Appendix 5.6 Designated Nature Conservation Site Synopses.pdf
ABP-314271-22 Appendix 5.7 Desktop Data.pdf
ABP-314271-22 Appendix 5.8 Collision Risk Model Report.pdf
ABP-314271-22 Appendix 5.9 Habitat Survey Results.pdf
ABP-314271-22 Appendix 5.10 Habitat and Species Management Plan.pdf
ABP-314271-22 Appendix 5.11 AA Screening and Natura Impact Statement.pdf
ABP-314271-22 Appendix 6-1.pdf
ABP-314271-22 Appendix 7-1 EU Directives.pdf
ABP-314271-22 Appendix 7-2 Water Framework Directive.pdf
ABP-314271-22 Appendix 7-3 Site Specific FRA.pdf
ABP-314271-22 Appendix 7-4 WF Drainage Report.pdf
ABP-314271-22 Appendix 7-5 Rating of Existing Env Sig.pdf
ABP-314271-22 Appendix 7-6 Description of Effects (EPA 2022).pdf
ABP-314271-22 Appendix 7-7 Classification of the Significance of Impacts (EPA, 2022).pdf
ABP-314271-22 Appendix 8-1.pdf
ABP-314271-22 Appendix 9-1 - 9-6.pdf
ABP-314271-22 Appendix 10.1 Landscape.pdf
ABP-314271-22.Appendix 11.1 Shadow Flicker Modelling Input Data by HouseWindow V1.pdf
ABP-314271-22.Appendix 11.2 Shadow Flicker Scenario 1 Shutdown Times by Turbine v1.pdf
ABP-314271-22.Appendix 11.3 Shadow Flicker Scenario 2 Shutdown Times by Turbine v1.pdf
ABP-314271-22 Chapter 12 Appendices 12.1 - 12.3.pdf
ABP-314271-22 Appendix 13-1 Forestry Report.pdf
ABP-314271-22 Appendix 14-1 Turbine Delivery Route Works Report.pdf
ABP-314271-22 Appendix 14-2 Traffic Survey Results.pdf
ABP-314271-22 Appendix 14-3 Construction Traffic Management Plan.pdf
240325 ABP-314271-22.AA screening and NIS Final.pdf
ABP-314271-22. Appendix 1 Bird survey reports.pdf
ABP-314271-22. Appendix 2 Aquatic survey reports.pdf
ABP-314271-22. Appendix 3 Habitat survey reports.pdf
ABP-314271-22. Appendix 4 Turbine Specifications.pdf
ABP-314271-22. Appendix 5 CEMP.pdf
ABP-314271-22. Appendix 6 Drainage Report.pdf
ABP-314271-22. Appendix 7 Habitats and Species Management Plan.pdf