Project Being Constructed

Project at a glance

 

  • The site is located Strabally, Co. Laois

  • Site size – circa 348 acres

  • Capacity to power circa 19,622 homes per year

  • Panel height approx. 2.5 metres above ground level

  • Meadow pasture across the site.

  • Natural screening from existing vegetation and supplemented by a landscaping plan

  • Potential to increase biodiversity in the area