Project Being Constructed
-
Will generate renewable electricity for the Irish Electricity Grid System
-
Comprises over 300,000 solar panels
-
With an output in the region of 175mW, it will have the capacity to reduce carbon emissions by approx. 750,000 tonnes
-
There will be an onsite 110kV substation
-
All cabling will be placed underground
-
Material for the construction of the roads and hardstanding areas will be sourced as locally as possible to minimise the number of traffic movements
-
Associated works include access tracks and hardstanding areas, a local borrow pit, drainage works, a temporary site compound, steel framework, mounted PV modules, underground electrical and communications cables between inverters and an underground cable to connect to the Grid
-
An inclusive Community Benefits package (based on feedback from those in the local area) has been developed which will allow a wide range of individuals and organisations to benefit from the proposed solar farm
-
More than 250 jobs will be created during the construction, operation and maintenance phases of the proposed project